Hotel main kitchen LPG pipeline — Lahore
hotels · Lahore · completed 2026-02-28
Scope
- Pipeline route from external cylinder cage to main kitchen and bakery line
- Pressure test pack with recorded readings before handover
- Isolation valves at cage, riser and each major appliance group
- Safety briefing for kitchen and engineering staff
Equipment
- Carbon steel / copper kitchen line
- Isolation valves
- Pressure gauges
- Cage ventilation upgrades
Outcome
Staged commissioning with documented test pressures; hotel engineering retained the test sheet with the site file.