Skip to content
THE LPG CO.

Hotel main kitchen LPG pipeline — Lahore

hotels · Lahore · completed 2026-02-28

Scope

  • Pipeline route from external cylinder cage to main kitchen and bakery line
  • Pressure test pack with recorded readings before handover
  • Isolation valves at cage, riser and each major appliance group
  • Safety briefing for kitchen and engineering staff

Equipment

  • Carbon steel / copper kitchen line
  • Isolation valves
  • Pressure gauges
  • Cage ventilation upgrades

Outcome

Staged commissioning with documented test pressures; hotel engineering retained the test sheet with the site file.

Related pages

Back to all projects

Call nowWhatsApp