Wedding hall peak-load cylinder bank — Rawalpindi
weddings and events · Rawalpindi · completed 2026-04-19
Scope
- Peak burner count for buffet and tandoor lines on wedding nights
- High-capacity cylinder bank with fast changeover
- Outdoor cage siting away from guest flow and generators
- Event-night standby refill plan with the local distributor
Equipment
- 45.4 kg cylinder bank
- Changeover manifold
- Heavy-duty regulators
- Cage locking
Outcome
Hall ran back-to-back events without flame loss on changeover; caterer kept the standby refill WhatsApp in the event pack.