Skip to content
THE LPG CO.

Wedding hall peak-load cylinder bank — Rawalpindi

weddings and events · Rawalpindi · completed 2026-04-19

Scope

  • Peak burner count for buffet and tandoor lines on wedding nights
  • High-capacity cylinder bank with fast changeover
  • Outdoor cage siting away from guest flow and generators
  • Event-night standby refill plan with the local distributor

Equipment

  • 45.4 kg cylinder bank
  • Changeover manifold
  • Heavy-duty regulators
  • Cage locking

Outcome

Hall ran back-to-back events without flame loss on changeover; caterer kept the standby refill WhatsApp in the event pack.

Related pages

Back to all projects

Call nowWhatsApp